Glen Hunt Glen Hunt
0 Course Enrolled • 0 Course CompletedBiography
Certified Data Centre Professional (CDCP) Practice Torrent & Certified Data Centre Professional (CDCP) Valid Cram & CDCP Study Valid Torrent
A free demo of CDCP practice test questions and up to 1 year of free updates are also available at DumpsTorrent. So, this is the time to download valid CDCP exam questions and start studying. There is no room for delays in CDCP Preparation exams or second thoughts when you know that you have to survive the competition and safeguard your job.
EXIN CDCP Exam Syllabus Topics:
Topic
Details
Topic 1
- Fire Safety
- Protection: This topic gives an understanding of standards for fire suppression, detection systems, total flooding fire suppression techniques, and handheld extinguishers. Additionally, it covers Signage and safety.
Topic 2
- Auxiliary Systems: The topic covers water leak detection systems, data centre monitoring requirements, EMS, BMS and DCIM.
Topic 3
- Electro Magnetic Fields: The topic deals with effects of EMF on human health and equipment (H)EMP, standards, and EMF shielding solutions.
Topic 4
- Cooling Infrastructure: The topic focuses on liquid immersion cooling, supplemental cooling options, sensible and latent heat definitions, and temperature and humidity recommendations.
Topic 5
- Designing a Scalable Network Infrastructure: It covers ANSI
- TIA-942 cabling hierarchy, network redundancy, structured Cabling System, and planning considerations.
Topic 6
- Data Centre Location, Building and Construction: It focuses on appropriate sites and components of an effective data centre and supporting facilities setup.
Topic 7
- Equipment Racks: It discusses power rail
- strip options, security considerations, and rack standards, properties and selection criteria.
Topic 8
- Raised Floor
- Suspended Ceiling: The topic discusses applicable standards, signal reference grid, and disability act and regulations.
Topic 9
- Power Infrastructure: It focuses ATS and STS systems, redundancy levels and techniques, static and dynamic UPS systems, battery types, thermo-graphics, and renewable energy factor (REF).
CDCP Exam Testking - CDCP Reliable Mock Test
It's not easy for most people to get the CDCP guide torrent, but I believe that you can easily and efficiently obtain qualification certificates as long as you choose our products. After you choose our study materials, you can master the examination point from the CDCP Guide question. Then, you will have enough confidence to pass your exam. As for the safe environment and effective product, why don’t you have a try for our CDCP question torrent, never let you down!
EXIN Certified Data Centre Professional (CDCP) Sample Questions (Q59-Q64):
NEW QUESTION # 59
What is the main risk for a data centre when the water supply fails?
- A. Failure to the water supply could result in DX cooling systems to fail.
- B. Failure to the water supply could cause issues for the cooling of back-up generators.
- C. Failure to the water supply could result in IT failure and/or denial of access to operate.
- D. Failure to the water supply could result in sudden changes of the relative humidity in the Computer room.
Answer: B
Explanation:
Back-up generators are essential for providing power to the data centre in case of a utility outage. However, back-up generators also generate a lot of heat, which needs to be dissipated by a cooling system. The cooling system may rely on water supply, either from the municipal network or from a dedicated tank. If the water supply fails, the cooling system may not function properly, leading to overheating and potential damage to the generators. This could compromise the reliability and availability of the data centre power supply and cause downtime or data loss.
References:
1: CDCP Preparation Guide, page 18, section 2.3.2 2: Data Center Generator Cooling Systems3, page 1, section 1 4: Data Center Cooling Systems5, page 1, section 1
NEW QUESTION # 60
The temperature and humidity values indicated on the display of the Computer room air conditioner unit are the values measured at which point?
- A. It is the value measured at the intake of the air conditioner.
- B. It is the value measured at the exhaust (outlet) of the air conditioner.
- C. It is the value measured at the front of the rack of the aisle the air conditioner is situated.
- D. It is the average value between the intake and exhaust (outlet) of the air conditioner.
Answer: A
Explanation:
According to the IBM document on temperature and humidity design criteria1, the temperature and humidity values indicated on the display of the computer room air conditioner unit are the values measured at the intake of the air conditioner. This is because the intake is where the air conditioner draws the air from the computer room and cools and dehumidifies it before sending it back to the computer room. The display shows the current conditions of the computer room air, which are used to adjust the cooling and dehumidifying operations of the air conditioner. The values measured at the exhaust (outlet) of the air conditioner are not displayed, as they are not relevant for the computer room environment. The values measured at the front of the rack of the aisle the air conditioner is situated are also not displayed, as they may vary depending on the distance and location of the rack. The average value between the intake and exhaust (outlet) of the air conditioner is not displayed, as it does not reflect the actual conditions of the computer room air or the air conditioner performance.
References: 1: Temperature and humidity design criteria - IBM
NEW QUESTION # 61
When having two non-synchronized power sources, the ATS / STS need to be of the type:
- A. Both make before break or break before make can be used.
- B. Both an ATS and STS can never handle two non-synchronized sources.
- C. Make before break.
- D. Break before make.
Answer: D
Explanation:
When having two non-synchronized power sources, the ATS / STS need to be of the type break before make, which means that the switch disconnects from one source before connecting to the other source. This prevents any short circuit, back feed, or phase mismatch that could occur if the two sources were connected simultaneously. Break before make switches are also known as open transition switches, because they create a brief interruption in the power supply during the switching process. This interruption is usually acceptable for most ICT equipment, as they have internal power supplies or batteries that can handle the transient. However, if the interruption is not acceptable, then the two power sources need to be synchronized before switching, which requires a make before break switch, also known as a closed transition switch. Make before break switches connect to the second source before disconnecting from the first source, which ensures a seamless transfer of power without any interruption. However, make before break switches require that the two sources have the same voltage, frequency, and phase, which can be achieved by using a synchronization module or a phase-locked loop.
References:
1: CDCP Preparation Guide, page 17, section 2.3.1 2: STS in data centres - Borri3, page 1, section 1 4: Using Static Transfer Switches to Enhance Data Center ... - Donwil5, page 1, section 1 6: What is an Automatic Transfer Switch (Power)? | Ethan Banks7, page 1, section 1
NEW QUESTION # 62
systems are designed specifically to protect the structure of a building.
- A. Inergen
- B. Water sprinkler
- C. Total Flooding
- D. Pro-inert
Answer: B
Explanation:
Water sprinkler systems are designed to protect the structure of a building from fire by suppressing or extinguishing the flames with water. Water sprinkler systems are typically installed in the ceiling or walls of a building and are activated by heat or smoke detectors. Water sprinkler systems can reduce the risk of fire spreading and causing structural damage to the building.
References:
*EPI Data Centre Professional (CDCP®) Preparation Guide, page 28
*Fire Protection Systems for Data Centers | EPI
NEW QUESTION # 63
Which one of the following is a Natural Disaster?
- A. Blackouts
- B. Grid Failure
- C. Human Error
- D. Hurricanes
Answer: D
Explanation:
According to the CDCP® Preparation Guide, a natural disaster is a catastrophic event that is caused by natural forces and has a significant impact on human lives, property, and environment. Hurricanes are examples of natural disasters, as they are powerful storms that form over warm ocean waters and produce strong winds, heavy rain, storm surges, and flooding. Grid failure, blackouts, and human error are not natural disasters, but rather man-made or technological disasters that result from failures or errors in human systems or activities.
References: CDCP® Preparation Guide, page 9. Natural Disaster Readiness for Data Centers. EM-DAT - The international disaster database. PDC Global - Pacific Disaster Center.
NEW QUESTION # 64
......
As the old saying goes people change with the times. People must constantly update their stocks of knowledge and improve their practical ability. Passing the test CDCP certification can help you achieve that and buying our CDCP test practice materials can help you pass the CDCP test smoothly. Our CDCP study question is superior to other same kinds of study materials in many aspects. Our CDCP test bank covers the entire syllabus of the test and all the possible questions which may appear in the test. You will pass the CDCP exam for sure.
CDCP Exam Testking: https://www.dumpstorrent.com/CDCP-exam-dumps-torrent.html
- Latest CDCP Test Labs 🌹 CDCP Latest Test Cost 😋 CDCP Latest Test Guide 🖤 Open website { www.pass4leader.com } and search for ⇛ CDCP ⇚ for free download 📘CDCP Simulations Pdf
- 100% Pass 2025 Pass-Sure EXIN CDCP Frequent Updates ↗ Open website ➠ www.pdfvce.com 🠰 and search for ➽ CDCP 🢪 for free download 🏅CDCP Exam Revision Plan
- CDCP Passed ⚗ CDCP Exam Revision Plan 🎲 New CDCP Exam Vce 🏯 Open “ www.testsimulate.com ” enter “ CDCP ” and obtain a free download 💮CDCP Reliable Exam Pass4sure
- 2025 CDCP Frequent Updates: Certified Data Centre Professional (CDCP) - High Pass-Rate EXIN CDCP Exam Testking 🟩 Search for { CDCP } and easily obtain a free download on ⇛ www.pdfvce.com ⇚ 🌗Latest CDCP Exam Fee
- CDCP Latest Study Questions 🌜 Exam CDCP Passing Score 🚴 CDCP Reliable Study Questions 🏝 Simply search for ▷ CDCP ◁ for free download on ⇛ www.actual4labs.com ⇚ 🍋CDCP Free Dump Download
- CDCP Pass4sure Dumps Pdf 🔹 Latest CDCP Test Labs 🤲 CDCP Latest Test Guide 👑 Open 「 www.pdfvce.com 」 and search for { CDCP } to download exam materials for free 🕖CDCP Pass4sure Dumps Pdf
- 2025 EXIN Pass-Sure CDCP Frequent Updates 🍞 Download ➤ CDCP ⮘ for free by simply entering ➥ www.examdiscuss.com 🡄 website 🌿CDCP Passed
- Valid CDCP Test Syllabus 💽 CDCP Latest Test Cost 🤶 CDCP Exam Revision Plan 🕑 Enter ➡ www.pdfvce.com ️⬅️ and search for [ CDCP ] to download for free 🕸CDCP Reliable Study Questions
- CDCP Free Dump Download 🏧 Certification CDCP Sample Questions 📏 CDCP Simulations Pdf 🥇 Easily obtain 《 CDCP 》 for free download through ➡ www.examsreviews.com ️⬅️ 🌶Exam CDCP Passing Score
- CDCP Frequent Updates - EXIN CDCP Exam Testking: Certified Data Centre Professional (CDCP) Exam Pass Once Try 🐩 Search on 《 www.pdfvce.com 》 for ( CDCP ) to obtain exam materials for free download 😇Valid CDCP Test Sample
- Valid CDCP Test Sample 🕶 CDCP Simulations Pdf 🦸 CDCP Free Dump Download 🌹 Go to website 【 www.prep4pass.com 】 open and search for { CDCP } to download for free 🟢CDCP Passed
- CDCP Exam Questions
- globaleducare.org hopesightings.ehtwebaid.com carolai.com thinkoraa.com elearning.imdkom.net setainstitute.tech adrcentre.org explaintennis.com www.acolsi.org aplusprotuition.online